Slow weekend, little progress has been made what with one thing and another!
Finished wiring inside the car, nothing more to do other than run the cables to the rear of the car.
Installed the shifter so I could sort wiring for reverse lights etc and found that the shifter cable wanted to go through the floor and not the existing hole.
Some gentle persuasion with a big hammer soon fixed that. Need to repaint that section again now though. Also had to modify the bodged shift lever on the transmission. However it's now all fully functional.
Pulled the x pipe off to extend and fully weld. Simple job, just need to get the hangers sorted for the mufflers now. Going to run without tail pipes for the time being, might stick some turn downs on it. Tail pipes are a nice easy addition at a later date.
Dug the core support out from the corner of the workshop and bolted it up. Dropped the radiator in and made a top plate/bracket for it. Went to fit the rad fan but couldn't find it's little plastic feet. Ordered some more anyway.
Next job's finish the fuel, water and transmission lines.
_________________
My '80 progress thread - hugger orange!
Now with LQ9 power - forged pistons, LS2 rods, 236/242, .621/.612, flowed and milled 317 heads. MS3X
4L80e, 12 bolt, 4.11, Moroso brute strength posi, steel shafts.